Reserves and Resources

 September 18, 2017
 
Mineral Reserve and Mineral Resource Estimates


Americas Silver's reserves and resources have been calculated as at June 30, 2017 in accordance with definitions adopted by the Canadian Institute of Mining, Metallurgy and Petroleum and incorporated into National Instrument 43-101.

For further detail regarding the extent to which estimates of Mineral Resources and Reserves may be materially affected by external factors, including metallurgical, environmental, permitting, title and other risks and relevant issues, please refer to the Company's Annual Information Form.

Proven and Probable Mineral Reserves June 30, 2017
                 
  Grade Contained Metal
  Tonnes Silver Copper Lead Zinc Silver Copper Lead Zinc
  000s g/t % % % koz Mlbs Mlbs Mlbs
Cosal�                  
� Nuestra Se�ora                  
���� Proven 34 79 0.20 0.80 1.43 87 0.2 0.6 1.1
���� Probable 228 96 0.27 0.90 1.74 708 1.3 4.5 8.8
� Nuestra Se�ora P&P 263 94 0.26 0.89 1.70 794 1.5 5.1 9.9
� San Rafael                  
���� Proven 1,585 110 -- 1.83 4.15 5,623 -- 63.9 145.0
���� Probable 2,156 93 -- 1.59 4.05 6,476 -- 75.7 192.6
� San Rafael P&P 3,741 101 -- 1.69 4.09 12,100 -- 139.6 337.6
Total Cosal� P&P 4,004 100 0.02 1.64 3.94 12,894 1.5 144.8 347.5
Galena                  
� Silver-Copper                  
���� Proven 162 506 0.44 -- -- 2,635 1.6 -- --
���� Probable 237 584 0.42 -- -- 4,453 2.2 -- --
� Silver-Copper P&P 399 552 0.43 -- -- 7,088 3.8 -- --
� Silver-Lead                  
���� Proven 443 268 -- 8.35 -- 3,817 -- 81.5 --
���� Probable 512 273 -- 8.48 -- 4,491 -- 95.6 --
� Silver-Lead P&P 954 271 -- 8.42 -- 8,308 -- 177.1 --
Total Galena P&P 1,354 354 0.13 5.93 -- 15,396 3.8 177.1 --
Total P&P 5,358 164 0.04 2.73 2.94 28,290 5.2 321.9 347.5


Measured and Indicated Mineral Resources (Exclusive of Mineral Reserves) June 30, 2017
                 
Grade Contained Metal
Tonnes Silver Copper Lead Zinc Silver Copper Lead Zinc
  000s g/t % % % koz Mlbs Mlbs Mlbs
Cosal�                  
� Nuestra Se�ora
�� ��Measured 257 85 0.16 0.84 1.76 700 0.9 4.8 10.0
�� ��Indicated 1,779 89 0.20 0.81 1.74 5,069 7.7 31.9 68.1
� Nuestra Se�ora M&I 2,036 88 0.19 0.82 1.74 5,769 8.6 36.7 78.0
� San Rafael
�� ��Measured 1,233 110 -- 0.95 2.15 4,345 -- 25.7 58.3
���� Indicated 1,641 88 -- 0.93 2.08 4,628 -- 33.5 75.3
� San Rafael M&I 2,874 97 -- 0.93 2.11 8,973 -- 59.2 133.6
� Zone 120
�� ��Measured
���� Indicated 2,090 187 0.48 -- -- 12,569 22.3 -- --
� Zone 120 M&I 2,090 187 0.48 -- -- 12,569 22.3 -- --
� El Caj�n
�� ��Measured
���� Indicated 1,003 177 0.55 -- -- 5,719 12.2 -- --
� El Caj�n M&I 1,003 177 0.55 -- -- 5,719 12.2 -- --
Total Cosal� M&I 8,003 128 0.24 0.54 1.20 33,030 43.1 95.9 211.6
Galena
� Silver-Copper
�� ��Measured 220 583 0.70 -- -- 4,117 3.4 -- --
���� Indicated 502 626 0.61 -- -- 10,115 6.7 -- --
� Silver-Copper M&I 722 613 0.63 -- -- 14,231 10.1 -- --
� Silver-Lead
�� ��Measured 437 282 -- 9.18 -- 3,962 -- 88.3 --
���� Indicated 750 276 -- 9.01 -- 6,661 -- 149.0 --
� Silver-Lead M&I 1,187 278 -- 9.07 -- 10,623 -- 237.3 --
Total Galena M&I 1,909 405 0.24 5.64 24,854 10.1 237.3
Total M&I 9,912 182 0.24 1.52 0.97 57,884 53.1 333.2 211.6


Inferred Mineral Resources June 30, 2017
                 
Grade Contained Metal
Tonnes Silver Copper Lead Zinc Silver Copper Lead Zinc
  000s g/t % % % koz Mlbs Mlbs Mlbs
Cosal�                  
���� Nuestra Se�ora 2,009 101 0.26 0.83 1.90 6,539 11.3 37.0 84.3
�� ��San Rafael 461 166 -- 2.20 0.39 2,455 -- 22.4 4.0
���� Zone 120 1,379 216 0.59 -- -- 9,590 17.9 -- --
�� ��El Caj�n 278 103 0.18 -- -- 923 1.1 -- --
Total Cosal� Inferred 4,127 147 0.33 0.65 0.97 19,507 30.3 59.4 88.3
Galena                  
���� Silver-Copper 316 671 0.74 -- -- 6,815 5.1 -- --
�� ��Silver-Lead 1,351 240 -- 9.24 -- 10,409 -- 275.3 --
Total Galena Inferred 1,667 321 0.14 7.49 0.00 17,224 5.1 275.3 0.0
Total Inferred 5,794 197 0.28 2.62 0.69 36,731 35.4 334.7 88.3

Notes for Mineral Reserve and Mineral Resource Estimates:
  1. CIM Definitions and Standards were followed for Mineral Reserve and Mineral Resource Estimates.
  2. Mineral Reserves are estimated at a NSR cut-off value of US$40/tonne at Nuestra Se�ora, US$54/tonne at San Rafael and US$190/tonne at Galena.� The NSR cut-off is calculated using recent operating results for recoveries, off-site concentrate costs, and on-site operating costs.
  3. Mineral Resources are estimated at a NSR cut-off value of US$34/tonne at San Rafael, US$40/tonne at Zone 120, US$30/tonne at El Caj�n and US$190/tonne at Galena.� Mineral Resources at Nuestra Se�ora are estimated at a 90g/tonne silver equivalent cut-off grade.� NSR and silver equivalent cut-offs were calculated using recent or expected operating results for recoveries, off-site concentrate costs, and on-site operating costs.
  4. Mineral Reserves are estimated using metal prices of US$16.00/oz Ag, $2.50/lb Cu, $0.90/lb Pb and $0.90/lb Zn.
  5. Mineral Resources are estimated using metal prices of US$18.00/oz Ag, $3.00/lb Cu, $1.05/lb Pb and $1.05/lb Zn.
  6. Mineral Resources are exclusive of Mineral Reserves and as such the Mineral Resources do not have demonstrated economic viability
  7. A minimum mining width of 4.5 feet was used for estimating Galena Reserves, with a minimum additional dilution of 0.5 feet from both the hangingwall and footwall.� A mining recovery of 95% was used to reflect the selective nature of the mining methods used at the operation.
  8. A mining recovery of 90% was used for estimating Mineral Reserves at Nuestra Se�ora and San Rafael to reflect the mining methods used at the operations.
  9. Numbers may not add or multiply accurately due to rounding.
  10. The Mineral Resource estimate for the Cosal� Operations is based on block models prepared by independent mineral resource consultants. The Nuestra Se�ora Mineral Reserve and Resource estimate was prepared by Company personnel under the supervision of James Stonehouse, a Qualified Person for the purpose of NI 43-101.� The San Rafael, Zone 120 and El Caj�n Mineral Resource estimates were prepared by� Paul Tietz, C.P.G.� who is all independent consultants and Qualified Persons for the purpose of NI 43-101.� The San Rafael Mineral Reserve estimate was prepared by company personnel under the supervision of Shawn Wilson, a Qualified Person for the purpose of NI 43-101.
  11. The Mineral Resource estimate for the Galena Complex was prepared using a combination of block modelling and the accumulation method.  The Mineral Resource estimate was prepared by Company personnel under the supervision of Aaron Gross, C.P.G., a Qualified Person for the purpose of NI 43-101.� The Mineral Reserve estimate was prepared by Company personnel under the supervision of Shawn Wilson, a Qualified Person for the purpose of NI 43-101.
 
 